Controlled Collapse
After examining the structural drawings and carrying out a survey, specific members were marked for pre-weakening. The structural engineers calculations confirmed that the remaining structure would remain stable before the members were cut in the planned sequence. From a safe distance the support legs were pulled out to bring about a controlled collapse. The twisted metal was then processed for commercial disposal using both oxy-propane cutting equipment and excavator mounted hydraulic rotating shears. |
||